We just installed one of our first micro-centers. This is a small training cluster and it’s a departure from our large school installations.
These four stations are driven by a single PC, which is loaded with RACHEL content.
Gerald and Sparks were on hand to assist with the installation, and I think the final product looks great. As always, I fussed over the cables and tried to keep the installation super tight. (More photos after the break .. )
So very pretty. I would love to be able to setup something like this locally, but most have nowhere to do it.